| 1 |
Introduction |
| 1.1 |
Overview of the Project |
| |
1.1.1 |
History |
| |
1.1.2 |
The Proposal |
| |
1.1.3 |
Special Considerations in the Suffield NWA |
| 1.2 |
The Proponent |
| |
1.2.1 |
Corporate Governance |
| |
1.2.2 |
Corporate Responsibility |
| |
1.2.3 |
Project Management |
| |
1.2.4 |
Preparation of the Environmental Impact Statement |
| |
1.2.5 |
Contact Information |
| 1.3 |
Context |
| |
1.3.1 |
Location |
| |
1.3.2 |
Regulatory Framework |
| |
|
1.3.2.1 |
Primary Approvals |
| 1.4 |
Project Justification |
| |
1.4.1 |
Purpose of the Project |
| |
1.4.2 |
Alternatives to the Project |
| |
| 2 |
Project Description |
| 2.1 |
Reservoir Characteristics |
| |
2.1.1 |
Shallow Gas |
| |
|
2.1.1.1 |
Geology |
| |
|
2.1.1.2 |
Gas Composition |
| |
|
2.1.1.3 |
Production |
| |
2.1.2 |
Other Hydrocarbon Production (Deep Rights) |
| |
2.1.3 |
Project Components |
| |
2.1.4 |
Wells |
| |
2.1.5 |
Gathering System |
| |
2.1.6 |
Access |
| |
2.1.7 |
Other Infrastructure |
| 2.2 |
Project Phases |
| |
2.2.1 |
Preconstruction Activities |
| |
2.2.2 |
Construction |
| |
|
2.2.2.1 |
Drilling |
| |
|
2.2.2.2 |
Completions |
| |
|
2.2.2.3 |
Well Tie-ins |
| |
|
2.2.2.4 |
Post-construction and cleanup activities |
| |
2.2.3 |
Operations |
| |
|
2.2.3.1 |
Well Testing |
| |
|
2.2.3.2 |
Swabbing and Well Site Visits |
| |
|
2.2.3.3 |
Pipeline Protection |
| |
|
2.2.3.4 |
Well Inspections and Pipeline Integrity Checks |
| |
|
2.2.3.5 |
Refracturing |
| |
2.2.4 |
Decommissioning and Abandonment |
| |
2.2.5 |
Malfunctions and Accidents |
| |
|
2.2.5.1 |
Collisions and Releases from Vehicles |
| |
|
2.2.5.2 |
Pipeline Releases |
| |
|
2.2.5.3 |
Blowouts and Surface Casing Vent Flow |
| |
|
2.2.5.4 |
Water Contamination |
| |
|
2.2.5.5 |
Water Requirements |
| |
|
2.2.5.6 |
Grassland Fires |
| 2.3 |
Chemicals and Hazardous Materials |
| 2.4 |
Emissions, Discharges, and Wastes |
| |
2.4.1 |
Air Emissions |
| |
|
2.4.1.1 |
Greenhouse Gas |
| |
|
2.4.1.2 |
EnCana’s Approach to Greenhouse Gas Management |
| |
2.4.2 |
Noise |
| |
2.4.3 |
Wastes |
| |
|
2.4.3.1 |
Drilling and Completion Wastes |
| |
|
2.4.3.2 |
Produced Water |
| |
|
2.4.3.3 |
Pigging and Well Treatment Wastes |
| 2.5 |
Schedule |
| 2.6 |
Costs |
| 2.7 |
Employment |
| 2.8 |
Alternative Means of Carrying out the Project |
| |
2.8.1 |
Drilling and Completion Techniques |
| |
2.8.2 |
Pipeline Testing Alternatives |
| |
2.8.3 |
Pipeline Routing Strategy |
| |
2.8.4 |
Water Supply |
| |
2.8.5 |
Maintenance and Production |
| |
2.8.6 |
Access |
| |
|
2.8.6.1 |
Layout |
| |
2.8.7 |
Waste Management |
| |
|
2.8.7.1 |
Drilling Waste Management |
| |
|
2.8.7.2 |
Completions Waste Management |
| |
|
2.8.7.3 |
Operations Waste Management |
| |
2.8.8 |
References |
|
Back to top
|
| 3 |
Environmental Setting |
| 3.1 |
Introduction |
| 3.2 |
Physiography |
| 3.3 |
Surficial and Subsurface Geology |
| 3.4 |
Climate |
| 3.5 |
Soil Landscapes |
| 3.6 |
Vegetation and Wetlands |
| 3.7 |
Wildlife and Wildlife Habitat |
| 3.8 |
Hydrologic Resources |
| 3.9 |
Land Uses |
| |
| 4 |
Environmental Management |
| 4.1 |
Corporate Responsibility Policy |
| 4.2 |
EnCana Existing Environmental, Health and Safety Best Practices Management System |
| 4.3 |
Public Consultation |
| 4.4 |
Comprehensive Project Environmental Assessment |
| 4.5 |
Environmental Protection Plan |
| |
4.5.1 |
Waste Management |
| |
4.5.2 |
Conceptual Reclamation Plan |
| 4.6 |
Incident Management System |
| |
4.6.1 |
Emergency Response Plan |
| |
4.6.2 |
Fire Contingency and Suppression |
| 4.7 |
Environmental Effects Monitoring |
| |
4.7.1 |
Structure |
| |
| 5 |
Concordance Table |
| |
| 6 |
Public Consultation |
| 6.1 |
Consultation Program and Objectives |
| |
6.1.1 |
Public Consultation Stages |
| |
6.1.2 |
Phase I – Stakeholder Identification and Preliminary Communications |
| |
6.1.3 |
Phase II – Consultation on the Project Description, Guidelines, Identifying Issues and Scoping |
| |
6.1.4 |
Phase III – Follow-up and Ongoing Communications |
| 6.2 |
Integration of Issues and Concerns into Project Planning |
| 6.3 |
Public Consultation Influence on the Project |
| 6.4 |
Public Consultation Summary Comments |
| |
| 7 |
References |